Project: Ballast Water Treatment System Installation
Project Overview: Remove existing ballast water treatment system and install upgraded Alpha Laval Flex 600 system.
Project Length: 3 weeks
Project Location: Sailing project onboard a cruise ship
Project Highlights:
- Mechanical & Electrical Scope
-
- Remove existing Ballast Treatment Plant (Ocean Guard).
- Filter.
- UV Reactor.
- Neutralization Unit.
- Electrical Cabinets.
- Pipework between equipment and tie-in connections.
- Remove redundant pipework back to the tie in points for the new Alpha Laval Ballast Water Treatment System.
- Fabricate and install/Modify steelwork to accept the following equipment.
- Filtrex filter drip tray.
- Filtrex filter support structure.
- Backflush pump support structure.
- UV Reactor support structure.
- Transformer support structure.
- CIP Unit including dedicated catch all.
- Electrical Cabinet.
- Lamp Drive Cabinet.
- Lift equipment into position and secure on the above steelwork.
- Fabricate and install pipework to specified drawings.
- Example layout drawing below.