Customer: Carnival UK
Project: Alfa Laval Ballast Water Treatment System Installation
Project Overview: Complete electrical and mechanical turnkey installation in-service on multiple vessels
Project Highlights:
- Working in partnership with customers preferred Engineering Solution provider
- Pre-fabrication of all pipe spools
- Pre-fabrication of base frames and support frames
- Installation of new CuNi pipework according to 3D scan survey and installation drawings
- Installation of Alfa Laval OEM supplied equipment
- Supply and installation of all interconnecting pipework valves and controls
- Design, supply and installation of new 690/440V Transformer
- Design, supply and installation of new 440V Distribution Board
- LV and control cable installation and termination
- Full Insulation Resistance Testing of all newly installed cables