Island Princess refit

Trieste, Italy: brand new scrubber unit installed, including:

  • All electrical components & works
  • All  pumps
  • All filters
  • All valves
  • All pipework components, fabrication & works (200m of GRE)

High Fog Fire Fighting system installed in the machinery space. Works included Lloyd’s approved pressure testing & bulkhead penetrations.

 

DN300 return line passing above DG1 & DG2
DN300 return line passing above DG1 & DG2
CuNi 9010 main sea water supply line to scrubber tower
CuNi 9010 main sea water supply line to scrubber tower

Pacific Dawn refit, Australia

Atlantic Pacific Marine completed a refit of the Pacific Dawn in Australia in January. The project was finished in 12 days, and works included:

- renewing 60m of HVAC ducting for the main air intake supplying the cabins

- steam pipes and valves changed and overhauled on the boiler system

- fitting 2 new ballast pumps, including fabricating the new bed plates

- HG pumps and various pipework renewals

- HFO fuel tank repairs (clean-up; wastage cut-out; new 1m x 500ml steel plate prepped and welded-in)

- fuel line repairs

- bridge modifications (new cable runs installed; new bases fabricated and welded-in for the new radar system)

- supply and fitting of new laundry heater

- steel work (deck inserts) repairs on deck 14

Aurora refit, Hamburg

Atlantic Pacific Marine’s team of 60 engineers completed a refit of the Aurora whist she was dry-docked in Hamburg in December – 5 days ahead of schedule. Works included renewing the fresh water system and pipework throughout the vessel – the majority of which was GF.

Plenum upgrades on the Caribbean Princess

Plenum upgrades on the Caribbean Princess.

Before:

Plenum upgrades - before work Plenum upgrades - before work

 

After:

Pleunum upgrades - after work 2 Plenum upgrades - after work 3 Plenum upgrades - after work 3

Bow strengthening on the Star Princess

Following bow damage caused by bad weather, our team of 12 men undertook a full survey, submitted drawings for Lloyd’s approval, and completed repairs using 60 tonnes of steel. The project took 3 months.

Star Princess Bow strengthening, APM Star Princess Bow strengthening, APM

VGD Compressor upgrade project

As part of a fleet-wide fuel-saving project for Princess Cruises, we removed an existing AC Compressor and replaced it with the latest model, which weighed in at 3 tonnes. We worked alongside Johnston Controls International (JCI) who were the main contractor. We assisted JCI with the heavy lifting and rigging; suspending a 5 tonne motor whilst they modified steelwork and pipework.

APM VGD upgrade project Atlantic Pacific Marine VGD upgrade project

Atlantic Pacific Marine VGD upgrade project Atlantic Pacific Marine VGD upgrade project

Atlantic Pacific Marine VGD upgrade project Atlantic Pacific Marine VGD upgrade project

Atlantic Pacific Marine VGD upgrade project

 

 